Iranian crude inventory levels have increased by roughly 13 MMb since the blockade was implemented. Iran has 22 MMb of spare storage capacity remaining, based on an 80% maximum utilization of design capacity. At current build rates, Iran currently has an estimated six weeks before reaching tank tops, or about two weeks based on pre-war …