Machine downtime comes at an exceptional cost for manufacturers. Siemens’ True Cost of Downtime study reported the cost of a lost production hour at $36,000 in fast-moving consumer goods (FMCG) and up to $2.3 million in automotive manufacturing. Whether a stop is planned or not, a slow repair makes it longer, and every added hour […] The post Reducing Machine Downtime: Replacement Part Design for Serviceability and Maintainability appeared first on Fictiv .