By: Tim Latimer, CEO and Co-Founder, Fervo Energy Last week, we announced the results of our Sawtooth 7 well. Sawtooth 7 was the ninth well drilled for our Cape Phase II project and represents a major leap forward in our drilling complexity and performance. It was drilled to 19,448 feet, with a casing diameter of […]