Sawtooth 7 sets a new drilling pace record, reaching 19,448 feet measured depth with a 7,500-foot lateral in 21 days HOUSTON, July 8, 2026 — Fervo Energy, the leader in enhanced geothermal systems (EGS), today announced that it has drilled Sawtooth 7, the ninth well using its 3.0 well design at Cape Station for Phase […]