Above the high-desert sands of Fort Irwin during Project Convergence-Capstone 6 (PC-C6), Army Aviation demonstrated decisive air-launched capabilities in contested airspace. The U.S. Army proved it was actively delivering integrated sensor-to-shooter lethality to the tactical edge by pairing two Active/Passive Infrared launch effects (LEs) — which successfully executed the mission to detect, identify, locate, and report (DILR) the threat — with a third, “lethal LE” Long-Range Precision Munition (LRPM) that executed the terminal strike.