How AI is applied across API Evangelist and APIs.io. Read my AI disclosure →
API Evangelist API Evangelist
Discovery
Learnings
Guidance
Toolbox
Alignment
API Evangelist LLC

Point-to-Point at 100Gbps: What AI-Grade Infrastructure Actually Requires

calendar_today April 23, 2026 person Brent Nowak domain backblaze
A decorative image that shows several cubes on a background.

Bandwidth purchased for data center connectivity surged by nearly 330% between 2020 and 2024, driven primarily by AI workloads. And in 2024, just 10 buyers accounted for nearly 62% of all purchases, according to Zayo’s Bandwidth Report. That concentration is a structural feature of how AI moves data.

Every training run that pulls data from Backblaze storage to a neocloud passes through our network, and our telemetry captures what those flows look like in real time. Our Q4 2025 Network Stats report covers a full quarter of that data. It shows AI workloads producing a distinct network signature: sustained, high-volume transfers between a small number of endpoints, with infrastructure requirements specific enough to be worth examining in detail.

This piece walks through what that signature looks like and what it means for the infrastructure decisions teams are making right now.

The AI model lifecycle and how it moves data

AI model development is a cycle. Large datasets are ingested and consolidated, exported to compute for training, pulled back for evaluation, then pushed out again as models are refined, retrained, and updated with new data. Each stage requires moving substantial volumes of data between storage and compute, repeatedly, over the life of a model.

open_in_new Read original post